Wirtschaftswissenschaftliche Fakultät

Suche

Publikationen von Florian Jaehn


Aufsätze in begutachteten Zeitschriften und Proceedings

Scheduling position-dependent maintenance operations.
Operations Research, to appear, (mit M. Drozdowski und R. Paszkowski).

Scheduling cooperative gantry cranes with seaside and landside jobs.
Discrete Applied Mathematics, to appear, (mit D. Kress).

An integrated model for the transshipment yard scheduling problem.
Journal of Scheduling, Volume 20, S. 57-65, 2017, (mit M. Cichenski, G. Pawlak, E. Pesch, G. Singh und J. Blazewicz).

Flight gate assignment and recovery strategies with stochastic arrival and departure times.
OR Spectrum, Volume 39, S. 65- 93, 2017, (mit U. Dorndorf und E. Pesch).

Scheduling with time dependent discrepancy times.
Journal of Scheduling, Volume 19, S. 737-757, 2016, (mit H. A. Sedding).

Housekeeping: Foresightful container repositioning.
International Journal of Production Economics, Volume 179, S. 203-211, 2016, (mit A. Ehleiter).

Shunting of trains in succeeding yards.
Computers and Industrial Engineering, Volume 102, S. 1-9, 2016, (mit S. Michaelis).

Sustainable Operations. PDF
European Journal of Operational Research, Volume 253, pp. 243-264, 2016.

Airplane boarding. PDF
European Journal of Operational Research, Volume 244, pp. 339–359, 2015, (mit S. Neumann)

Minimizing delays in a shunting yard. PDF
OR Spectrum, Volume 37, pp. 407-429, 2015, (mit J. Rieder und A. Wiehl)

Single-stage shunting minimizing weighted departure times.
Omega
, Volume 52, pp. 133–141, 2015, (mit J. Rieder und A. Wiehl)

Multiproduct batching and scheduling with buffered rework: The case of a car paint shop. PDF
Naval Research Logistics, Volume 61, pp. 458–471, 2014, (mit S. Kovalev, M. Kovalyov und E. Pesch)

Single Machine Scheduling with Nonmonotonic Piecewise Linear Time Dependent Processing Times. PDF
Proceedings of the 14th International Conference on Project Management and Scheduling, pp. 222-225, 2014, (mit H. A. Sedding).

New bounds and constraint propagation techniques for the clique partitioning problem. PDF
Discrete Applied Mathematics, Volume 161, pp. 2025–2037, 2013, (mit E. Pesch)

Exact algorithms for inventory constrained scheduling on a single machine. PDF
Journal of Scheduling, Volume 16-1, pp. 105-115, 2013, (mit D. Briskorn und E. Pesch).

Positioning of loading units in a transshipment yard storage area. PDF
OR Spectrum, Volume 35-2, pp. 399-416, 2013.

A note on "Multistage Methods for Freight Train Classification". PDF
Networks Volume 62-1, pp. 80–81, 2013 (mit D. Briskorn).

A survey on container processing in railway yards. PDF
Transportation Science, Volume 47-3, pp. 312-329, 2013, (mit N. Boysen, M. Fliedner und E. Pesch).

Shunting yard operations: Theoretical aspects and applications. PDF
European Journal of Operational Research, Volume 220-1, pp. 1-14, 2012, (mit N. Boysen, M. Fliedner und E. Pesch).

New bounds and algorithms for the transshipment yard scheduling problem. PDF
Journal of Scheduling, Volume 15, pp. 499-511, 2012, (mit N. Boysen und E. Pesch).

Flight gate scheduling with respect to a reference schedule. PDF
Annals of Operations Research, Volume 194, pp. 177-187, 2012, (mit U. Dorndorf und E. Pesch).

Scheduling freight trains in rail-rail transshipment yards. PDF
Transportation Science, Volume 45, pp. 199-211, 2011, (mit N. Boysen und E. Pesch).
 
Extensions to STaTS for practical applications of the facility layout problem. PDF 
European Journal of Operational  Research, Volume 204, pp. 463-472, 2010, (mit A. Junker und D. Scholz).  

The emissions trading paradox. PDF
European Journal of Operational Research, Volume 202, pp. 248-254, 2010, (mit P. Letmathe).

Solving the flight gate assignment problem using dynamic programming. PDF
Zeitschrift für Betriebswirtschaft, Volume 80, pp. 1027-1039, 2010.

Modelling robust flight gate scheduling as a clique partitioning problem. PDF
Transportation Science, Volume 42, pp. 292-301, 2008, (mit U. Dorndorf und E. Pesch).

A new branch and bound algorithm for the clique partitioning problem.
Operations Research Proceedings 2008, pp. 457-462, 2008, (mit E. Pesch).

Disruption management in flight gate scheduling. PDF
Statistica Neerlandica, Volume 61, pp. 92-114, 2007, (mit U. Dorndorf, C. Lin, H. Ma und E. Pesch).

Modeling robust flight gate scheduling as a clique partitioning problem. PDF
Proceedings of the 10th International Workshop on Project Management and Scheduling, pp. 175-179, 2006, (mit U. Dorndorf und E. Pesch).
 

Monographien

Ablaufplanung. Verlag
Springer Gabler, Berlin/Heidelberg, 2014 (mit E. Pesch).

Robust flight gate assignment.
Peter Lang, Frankfurt am Main/Berlin/Bern/Brüssel/ New York/Oxford/Wien, 2008.
 

Sonstige Veröffentlichungen

Bundesliga Tippspiel(erei). PDF
OR News, Nr. 33, pp. 21-22, 2008.

Robust flight gate assignment.
OR News, Nr. 34, pp. 31-32, 2008.